8 Odin Place, Beach Haven — A-frame interior renovation
Beach Haven, North Shore. Odin Place is A-frame country — steep-pitched homes from the seventies where every upstairs room has a raked ceiling and no two walls meet at ninety degrees. This job is a full interior renovation of one of them: linings out, services re-run, new openings formed, and the upstairs rooms rebuilt so the shape of the roof works for the house instead of against it.
Before: strip-out, framing and rough-in
Every good renovation starts with an honest strip-out. These shots are from day one onwards: the old deck demolished and cleared, wallpaper off the gable rooms, linings back to the framing downstairs, and the new electrical runs roughed in while the walls were open. The seventies wallpaper and the boxed-in linen cupboard went; the original timber floors and the raked timber ceiling stayed — the ceiling got a whitewash first coat to lighten the rooms without losing the timber. With the house open, the new vanities and fixtures were delivered and stacked by room, ready for the fit-out behind the paint.










Under the floor and up the scaffold
Renovating a seventies house properly means going where the problems hide. With the flooring lifted, the subfloor plumbing and joists were all opened up, checked and renewed where needed — the work nobody sees but everybody relies on. Outside, the scaffold went up and bridged over the garage roof to reach the tall gables safely, and the brick ends and joinery were prepped for their repaint. The original doors were worth keeping: the red front door and the glazed interior doors were all refinished rather than replaced, and the exposed beams on the raked ceiling stayed as the character of the house.









What we did
- Stripped the upstairs rooms back, then re-lined, stopped and painted them ready for new flooring
- Chased new heat pump pipework and electrical runs into the walls so nothing is surface-mounted
- Formed new window openings to get daylight into rooms that were dark under the rake
- Framed built-in storage into the dead triangles under the roof pitch — cabinetmaking, not off-the-shelf
- Reworked the hot water and services cupboard with proper ducting
- Kept and refinished the original timber doors and the timber-lined vaulted ceiling
About these photos
These are mid-build shots, taken while the house was in the honest stage — stopping compound drying on the walls, ladders on the floor, protection paper still down. We post them because this is where the quality of a renovation is actually decided. Straight lines under a raked ceiling, tidy chases for the heat pump, framing that squares up to a sloping roof: get those right and the finished rooms look effortless.
The built-in shelving shot shows the part of the job we enjoy most. Dean is a cabinetmaker as well as a builder, so the awkward space under the pitch becomes storage rather than a boxed-off void. The timber-lined ceiling was worth saving too — it is the character of the house, and painting it out would have cost the rooms their best feature.
Photos from the job










The finished home
And this is what all that strip-out and rough-in becomes. The upstairs bedrooms keep their raked ceilings — whitewashed now, with new windows pulling light into rooms that used to be dark — and the built-in window seats turn the gable ends into the best spots in the house. Both bathrooms are rebuilt with full-height tiles and matt black fittings, the kitchen is new from cabinetry to splashback, and the new back deck runs off the French doors so the living area doubles in summer.














The finished front

From the street the transformation is obvious — fresh paint right up the gables, repainted joinery, the brick cleaned up, and a new deck running the width of the front. The seventies shape is all still there; it just looks like someone loves it again.
Renovating an A-frame or a seventies home in Beach Haven or on the North Shore? Try our Cost Advisor or get in touch with Dean — the first visit and the conversation cost nothing.
Progress — deck on, paint underway
A second visit to the job, and the house has moved on. Outside, the new deck is framed and boarding has started — the substructure is levelled off the brick veneer so the finished deck sits true to the house. Inside, the repaint is well underway: floors protected, walls stopped and in undercoat, new pendant wiring dropped, and the first of the new bathroom and laundry fixtures delivered and stacked by room. The stairwell and bedrooms are primed ready for their top coats.









Outside: scaffold up, deck rebuilt, joinery repainted
With the interior under way, the job moved outside. Scaffold went up the full height of the gable so the roofline, soffits and upper walls could be prepped and painted safely, and the original bay window joinery was brought back rather than replaced — sills, mullions and panelling all repaired, filled and repainted against the old brick.
At the same time the tired back deck came out and a new one went in: fresh piles, bearers levelled across a sloping section, and joists framed out over the old deck so the family kept a usable back door until the last minute. Ten more photos from this stage below.










Progress — deck on, paint underway
A few weeks on and the job has moved outside as well as in. The back deck has been rebuilt from new piles up and the boards are going down, the scaffold has been and gone around the exterior for the repaint, and inside the living areas are through stopping and into top coats with the new bathroom fittings on site.










Outside: deck rebuilt from the ground up, scaffold and repaint
The back deck came out and went back properly — new piles concreted in, bearers bolted on and levelled off the house, then joists over the top. Out front, the scaffold went up so the gables, soffits and joinery could be prepped and repainted safely. Upstairs, the raked ceilings are stopped and ready for paint.