Here is an interesting job the team at MTP Renovations and Maintenance was called to solve and recently completed. A little bit different from the usual home renovation. After some heavy rain, the driveway on this property took a hit and was unsafe to continue using. The side of the driveway retaining got washed out…

← Recent jobs

Driveway Restoration In Auckland

by  | Mar 12, 2019 | Auckland West

    Here is an interesting job the team at MTP Renovations and Maintenance was called to solve and recently completed. A little bit different from the usual home renovation.

After some heavy rain, the driveway on this property took a hit and was unsafe to continue using. The side of the driveway retaining got washed out, causing it to be unstable.

Auckland driveway 20 – Driveway Restoration In Auckland

Auckland driveway 19 – Driveway Restoration In Auckland
Auckland driveway 1 – Driveway Restoration In Auckland

The team at MTP Renovations and Maintenance got to work to restore the driveway so that the homeowners could use it once again. The new driveway was of ‘original construction’, however, to replace it, this required us to help the client with Engineering, townplanning/draftsman, building consent, resource consent, Traffic Management plan to Auckland Transport then put Traffic Management Systems in place to allow us to bring in the diggers, trucks, and concrete trucks to allow us to construct the foundations of the new driveway just over 3m below the footpath level.

Here are the specifications used for the job:

Auckland driveway 17 – Driveway Restoration In Auckland

Auckland driveway 18 – Driveway Restoration In Auckland
Auckland driveway 16 – Driveway Restoration In Auckland

Our team had to completely dig out and remove what was left of the original driveway, and begin building the new driveway from the ground up.

Auckland driveway 6 – Driveway Restoration In Auckland

Auckland driveway 11 – Driveway Restoration In Auckland

Auckland driveway 10 – Driveway Restoration In Auckland

Auckland driveway 9 – Driveway Restoration In Auckland

Auckland driveway 4 – Driveway Restoration In Auckland

Auckland driveway 3 – Driveway Restoration In Auckland

Our team in action building up the foundation of the new driveway:

This project took 2 years to complete from the date the driveway got washed out until the completion date, with the process requiring:

  • Building consent
  • Resource consent
  • Auckland transport traffic management plan
  • Engineering
  • EQC
  • Town planning

It was one big job! But now it’s finished and it’s safe to say both our team and the home owners are happy to have an operational driveway once again.

‍

Related blogs:

‍Transforming Your House into a Dream Home with Renovation Contractors‍

‍3 Things to consider for old home Renovations‍

‍Renovating an older home without losing its character‍

‍Full Home Renovation: Property Overhaul‍

‍Mission Bay Home Renovation Transforms Old Home Into Modern Masterpiece  

   

Get in touch

Ready when you are.

Tell us what you want to renovate and we'll point you in the right direction — usually within one working day.