We met with our client one evening after work, Client had a few ideas around her bathroom / toilet renovation, and also wanted to make some changes to the master bedroom wardrobe, Removing the 4 hinged doors and the internal dividing wall, framing up for the opening for 4 sliding doors. We noted down the information and also offered a couple of our own ideas and options of products.

Following the initial visit, a concept floor plan was drawn up and sent out with a scope of works outlined and the requirements for the work was sent out to each of our contractors (building, electrical, plumbing, plastering, painting, tiling, floor coverings, shower cubicle) to provide costs. Our client also received the floor plan, this is to ensure that we have covered everything that was discussed. Once all contractors quotes were in, a full fixed price quote was written up ready to present to the client.

 

On acceptance of the quote a time line was drawn up and sent to all contractors and the client. 

Once we started the bathroom renovation and had stripped out the area completely, we found that the floor area under the existing acrylic shower tray had originally been set up for a tiled shower. We overcame this by using a floor levelling compound, and then set up the new shower tray. We came across some rotten framing which needed replacing due to the shower leaking from a poor install and set up.

The bathroom was completed in a timely manner 15 working days, start to finish. Our clients expectations were exceeded, she was thrilled to bits with the new layout, and the detail to finish.

 

Our client selected her own vanity, mirror and tiles, she went with a black powder coated shower, and black tapware throughout. While we were on site, we were asked to replace a door, change all the door handles throughout the property, replace light fitting and hand a couple of pendant lights. 

It is always a pleasure to do a renovation for a client who so happy with the job that they start referring you on.

We received a phone call the following week from a colleague of our clients wanting to upgrade their bathroom, toilet and shower room.

 

 